Difference between revisions of "Talk:MitoFit Proficiency Test"
From Bioblast
Laner Verena (talk | contribs) |
Laner Verena (talk | contribs) |
||
Line 34: | Line 34: | ||
|- | |- | ||
| 2018-10-15 | | 2018-10-15 | ||
| DatLab Files have to be sent to instruments@oroboros.at | | DatLab Files have to be sent to [[mailto:instruments@oroboros.at|instruments@oroboros.at]] | ||
Shipping of HEK cells | Shipping of HEK cells | ||
|- | |- |
Revision as of 13:23, 3 October 2018
Important information
How much time is needed for the execution of the test?
- Level 1. Air calibration and Instrumental background oxygen flux: ca. 3 hours
- Level 2. SUIT-1 or SUIT-2: ca. 3 hours, including air calibration
- Level 3. Data analysis: 1 hour
- Within the timespan of one workday, your personal proficiency is comprehensively evaluated, using your own O2k and your laboratory equipment
Is there any scientific objective?
- Together with a literature review and preliminary data from the Oroboros MitoFit laboratory, we are going to publish the test results in collaboration with the Department for Medical Statistics, Informatics and Health Economics, Medical University of Innsbruck, as part of the K-Regio Project MitoFit.
- With the participation in the MitoFit Proficiency Test, you agree on the use of experimental data collected for the test, to be used for research purposes in an anonym way.
Additional resources:
- For a comprehensive list of DatLab menus: MitoPedia DatLab
- MitoPedia - SUIT
- Flux analysis
- DatLab Protocols, DLP: List of titrations, marks, overview on the website.
Time schedule
Round 01
Date | |
---|---|
2018-10-09 | DatLab 7.3 and instructions to be sent to the participants of the study |
2018-10-10 to 15 | Level IPT to be performed: instrumental background oxygen flux and air calibration, using the Instrumental DLPs |
2018-10-15 | DatLab Files have to be sent to [[1]]
Shipping of HEK cells |
2018-10-17 | Arrival of shipment at customerโs site at the latest
Feedback on Level I sent to participants |
2018-10-17 to 26 | Level II PT to be performed: SUIT 1 / 2 technical repeats |
2018-10-28 | DatLab files to be sent to Oroboros for analysis (Level II) |
2018-10-31 | Feedback to the participants |