MitoEAGLE flyer: Difference between revisions
From Bioblast
No edit summary |
Nirschl Lisa (talk | contribs) No edit summary |
||
Line 5: | Line 5: | ||
== 2016-10-20 e-VOTE 02 == | == 2016-10-20 e-VOTE 02 == | ||
:::: The production of a flyer/folder and poster for dissemination purposes of our | :::: The production of a flyer/folder and poster for dissemination purposes of our MitoEAGLE project is included in Grant Period 1 with 2,700.- EUR. ย | ||
:::: The Core Group discussed a specific offer of Impact Ltd to produce a 4-page flyer/leaflet, to be completed by March 2017 within the limits of our budget (without poster). Details and comments from the Core Group (and from another COST Action) to this offer are summarized here: | :::: The Core Group discussed a specific offer of Impact Ltd to produce a 4-page flyer/leaflet, to be completed by March 2017 within the limits of our budget (without poster). Details and comments from the Core Group (and from another COST Action) to this offer are summarized here: | ||
::::ยปย http://www.mitoglobal.org/index.php/Talk:MITOEAGLE_flyer | ::::ยปย http://www.mitoglobal.org/index.php/Talk:MITOEAGLE_flyer | ||
Line 14: | Line 14: | ||
== Circular to the Core Group, 2016-10-16 == | == Circular to the Core Group, 2016-10-16 == | ||
****: Production of a flyer for dissemination purposes of our | ****: Production of a flyer for dissemination purposes of our MitoEAGLE project: 2,500.- EUR is included in Grant Period 1. ย | ||
:::: I was contacted by the director of the journal โImpactโ. Further Email correspondence and a telephone call resulted in a description of how a publication and 4-page flyer or leaflet might be completed by March 2017 within the limits of our budget. The details are summarized here:ย ย | :::: I was contacted by the director of the journal โImpactโ. Further Email correspondence and a telephone call resulted in a description of how a publication and 4-page flyer or leaflet might be completed by March 2017 within the limits of our budget. The details are summarized here:ย ย |
Revision as of 11:37, 12 January 2018
News and Events | Working Groups | Short-Term Scientific Missions | Management Committee | Members |
COST Action CA15203 (2016-2021): MitoEAGLE
Evolution-Age-Gender-Lifestyle-Environment: mitochondrial fitness mapping
MitoEAGLE flyer
Work in progress - Discussion page
2016-10-20 e-VOTE 02
- The production of a flyer/folder and poster for dissemination purposes of our MitoEAGLE project is included in Grant Period 1 with 2,700.- EUR.
- The Core Group discussed a specific offer of Impact Ltd to produce a 4-page flyer/leaflet, to be completed by March 2017 within the limits of our budget (without poster). Details and comments from the Core Group (and from another COST Action) to this offer are summarized here:
- ยป http://www.mitoglobal.org/index.php/Talk:MITOEAGLE_flyer
- A decision should be made by end of October, if we want to go ahead with this option.
- ยป MC MITOEAGLE e-VOTE 02
Circular to the Core Group, 2016-10-16
- Production of a flyer for dissemination purposes of our MitoEAGLE project: 2,500.- EUR is included in Grant Period 1.
- I was contacted by the director of the journal โImpactโ. Further Email correspondence and a telephone call resulted in a description of how a publication and 4-page flyer or leaflet might be completed by March 2017 within the limits of our budget. The details are summarized here:
- At present, I do not know of any superior alternative. I would greatly appreciate to hearing your oppinion. A decision should be made by end of October, if we want to go ahead with this option.
- This information is sent primarily to the Core Group. Probably we should have a quick e-vote by the Management Committee for a final decision.
- Best wishes,
- Erich